top of page
INTERCHANGE DESIGN
SR 528 Innovation Way Design Build Criteria Package
County:
Orange
Central Florida Expressway Authority
Client:
Design/build criteria package for a new interchange consisting of the addition of five ramps (including one loop ramp)
Project is on/off SR 528, two ramp bridges over the proposed All Aboard Florida (AAF) railway, and the overpass of Innovation Way over SR 528 and the AAF track. TBG is responsible for the design of the horizontal and vertical geometry for all ramps, designing superelevation transitions for reverse curves, layout of MSE wall locations, layout of resurfacing limits along SR 528 and demolition of existing ramps at Monument Parkway.
bottom of page